A kitchen redesign might take anything between a few months and a year or more to complete, depending on the scope of the job. The processes involved in a kitchen remodel similar for most projects but may vary depending on the scope of the work.

Following these steps, we feel, will guide you through a successful kitchen renovation. While some remodelers may encounter a few roadblocks along the way, stunning kitchen remodeling is attainable with the right strategy in place!

Before Beginning a Project

Before beginning a project, significant decisions must be taken, such as employing a contractor or doing it yourself.

What to Choose First When Remodelling a Kitchen

Dream Big and Set Achievable Goals

Begin by visualizing your ultimate aim, your dream. Collect images and inspiration for your design. Are you planning on replacing your cabinets, countertops, flooring, and appliances? Add a second sink or replace the range hood with a stylish one. Relocate a wall? Dream large, then determine what a need is and a nice-to-have. When remodeling a kitchen, what comes first?

Establish a Budget

It is critical to set a budget regardless of the entire financial amount. Discover what to expect in terms of costs and how to budget effectively.

Phase 1: Kitchen Remodeling Planning

Planning your kitchen remodel is critical to its success. It can take anywhere from a few weeks to many months, depending on the date of your kitchen remodel.

Assess Your Space

To begin a free kitchen design, all that is required is a few simple measurements of your space. If you’re dealing with a contractor, they can assist you in gathering accurate measurements. Souther Belt offers high-end kitchen design Houston tx.

Request Samples of Cabinetry

The style and color of your cabinet doors set the tone for your kitchen. Additionally, it assists you in selecting countertops, flooring, and other features. You’ll have plenty of time to narrow down your choices by ordering samples early in the process.

Consultation

Consult a kitchen designer to assist you in translating your vision and inspiration into a beautiful and efficient kitchen. After discussing your desires, needs, and budget, your designer will generate an initial design that you may tweak together until it meets your vision and objectives.

Submit Applications for Building Permits

A building permit is frequently required when making structural, plumbing, mechanical, or electrical changes to a home. If you hire a contractor, they should handle all permitting requirements. This process may take weeks or months, depending on the intricacy of the project and the municipality, so submit your application as soon as possible.

Complete Your Plans

Complete the design of your kitchen cabinets, timetable plans, and contracts. Create your scope of work, outlining who is accountable for each task. Establish a deadline for the completion of the work. It will assist in avoiding delays and misunderstandings.

Phase 2: Place Your Order (1-2 months)

It may take many months to shop for and order your things. Order Appliances Bear in mind that the size of the appliances will affect the size of the cabinets. Before acquiring cabinets, communicate any appliance adjustments to your designer to ensure that they will match your final design.

Purchase Cabinets

After you’ve finalized your kitchen design, you’ll place an order for the cabinets. Cabinet lead times vary depending on the cabinet manufacturer.

Purchase Supplementary Products

After choosing your cabinets, it’s time to look for complimentary products. It covers the following: flooring, hardware, countertops, lights, sink, and faucet. Bear in mind that any special order items may require additional delivery time.

New Product Inspection and Storage

Prepare a spot in your garage or another dry area for inspecting and storing new products. Numerous materials must be stored in a climate-controlled environment, such as wood cabinetry and flooring.

Construct a Temporary Kitchen

Establish a temporary kitchen before dismantling your current area. This may be as straightforward as a dorm-sized refrigerator and microwave. For others, an outside grill is ideal.
You may wish to budget additional time and money for eating out on a more frequent basis during the remainder of the project.

Organize Your Kitchen

Before swinging the sledgehammers, you’ll want to pack up everything in your kitchen. If you haven’t already, this would be a good opportunity to tidy your kitchen. Make certain to include products that you will require in your makeshift kitchen.

Phase 3: Preliminary Construction (1-6 weeks)

Rough construction entails tearing down the current kitchen, constructing structural elements, and framing the room. If the room footprint and appliance placement remain the same, this stage can be finished in a week or less.

Dismantle Your Kitchen (1 week)

After all new supplies have been received and examined, the moment has come to dismantle your existing kitchen. If you’re doing the demo yourself, be sure you have a plan for disposing of waste.

Make Changes to the Structure (2-4 weeks)

Now is the time to make structural alterations such as new windows, walls, or doorways. Before major structural alterations, DIYers should consult a professional, such as removing walls.

Plumbing, mechanical, and electrical rough-in (3-5 days)

Most utility rough-in work must be accomplished before installing the drywall and flooring. This enables inspection of the wiring and the installation of outlets, fixture boxes, and switches.

Phase 4: Complete the construction (1-2 months)

Complete construction occurs when all new products in the kitchen are installed. 

Construct Cabinets (3-5 days)

It’s time to install the kitchen’s major component, new cabinets. 

Countertops: Measuring, Fabricating, and  Installing (2-4 weeks)

Countertop measurements can be taken only after cabinets have been installed. Fabrication, or the process of creating the countertop, can then begin. This process can take up to a month, depending on the nature of the material. Installation is the final stage. It is the final phase of the kitchen remodeling process and possibly the most enjoyable.

Appliances and Fixtures Installation (1-5 days)

After the countertops are completed, the lighting is installed. Move heavy appliances carefully to avoid scratching or denting new floors and cupboards.

Details of Finishing and Hardware (1-2 weeks)

The kitchen’s finishing touches include Cabinet hardware, crown molding, paint touch-ups, and other elements. Check the level of all appliances and their connections.

Backsplash Installation (2-3 days)

The backsplash is the final big component to install. It typically takes two days but may take longer if you’re designing something intricate. Schedule a final examination by a building inspector if a building permit is required. These occur during regular business hours.

Maintain a Clean Construction Zone (1-2 days)

Cleaning entails removing dust and debris from the room and ventilation system, wiping down cupboards, and scheduling the removal of any waste bins.

Unpack and Enjoy!

 